Table 2 The cases comparison of periodontal disease treatments
CaseTreatment step 1Treatment step 2Treatment step 3Treatment step 4Prognosis and follow-up
Combined periodontal and implant treatment of a patient with chronic periodontitis and severe alveolar bone lossBasic periodontal treatment (non-surgical) and reassessmentIn the area of tooth #21, conducted GBR tissue increment surgery and dental implantation simultaneouslyTemporary restoration on the implant was made for gum shapingRemoved bad prosthesis in the area of tooth #11; permanent restorations were madeReceived good feedback from patient; new therapy idea combined implantation, periodontal and restorations. This patient only has a limited number of bone defects
Implant treatment of a case of severe chronic periodontitisInitial periodontal treatment: Oral hygiene instruction; scaling and root planning; tooth extraction (teeth #11, #12, #16, #21, #22, and #27); partial denture therapy (teeth #12-22); root canal treatment and hemisection (tooth #46); Occlusal adjustment (teeth #13 and #23)Oral functional rehabilitation treatment: Implant prosthesis (in the areas of teeth #12, #16, #22, #36, and #41)Temporary restoration: During the 5-mo relief period, a partial denture was placed in the maxillary anterior regionPermanent restoration: All custom abutments and porcelain fused to metal crowns were retainedThe screw was restored after cleaning and occlusal adjustment. The patient’s oral hygiene has been well maintained. There has not been any recurrence nor has the patient's periodontal disease worsened among other natural teeth
Treating severe periodontitis with staged load applied implant restorationFirst load-bearing stage: Removed the remaining teeth in the jaw; conducted immediate All-on-6 implant restoration and immediate loadingSecond load-bearing stage: Inserted four temporary Osstem mini implants; performed immediate loading, maxillary GBR technique, and lateral maxillary sinus lifting on both sidesThird load-bearing stage: Four temporary implants were removed, and eight permanent implants were placed; performed immediate loadingFourth load-bearing stage: The resin bridge was segmented for gingival repairRestored with custom abutments and the zirconium crown-bridge prosthesis