Basic Study
Copyright ©The Author(s) 2021.
World J Clin Oncol. Feb 24, 2021; 12(2): 95-102
Published online Feb 24, 2021. doi: 10.5306/wjco.v12.i2.95
Figure 1
Figure 1 Project workflow of initial multi-atlas library construction, MIM autosegmentation, and subsequent edits of generated structures to add to the MIM atlas library.